How We Work?
Professional Process Makes the Difference
Consulting ideas and design
Plan in detail
Sign contract and deposit
Preparation and implementation
Implement and test
Evaluation and acceptance

1. Consultation on Ideas and Design:
Objective: Understand the customer’s needs and desires, providing creative design ideas that align with their budget and specific requirements.
Steps:

Research: Learn about the project, the customer’s industry, and target audience.
Discussion: Conduct a face-to-face or online meeting to listen to the customer’s feedback and expectations.
Concept Development: Offer a range of creative, tailored design options for each project.
Presentation and Revision: Present the design proposals to the customer, gather feedback, and finalize the design.
2. Detailed Planning:
Objective: Build a detailed plan for each project to ensure it stays on schedule and within budget.
Steps:

Project Analysis: Analyze the project requirements in detail and identify the necessary resources.
Timeline Planning: Develop a detailed timeline for each project phase.
Budget Planning: Create a comprehensive cost estimate for each category.
Task Assignment: Assign specific tasks to each member of the implementation team.

3. Contract Signing and Deposit:
Objective: Establish a long-term partnership with the customer, securing the rights and interests of both parties.
Steps:

Contract Drafting: Draft a detailed service contract, including terms on the scope of work, schedule, cost, payment methods, and quality assurance conditions.
Contract Signing: Both parties sign the contract.
Deposit: The customer makes a deposit as per the agreement in the contract.

4. Preparation and Implementation:
Objective: Prepare all necessary resources for project implementation.
Steps:

Material Preparation: Gather all the required materials and equipment for the project.
Human Resource Allocation: Assign appropriate personnel to each task.
Construction Planning: Develop a detailed construction plan to ensure timely progress.

5. Execution and Quality Control:
Objective: Execute the project according to the plan and ensure the quality of work.
Steps:

Execution: Carry out tasks as planned.
Quality Control: Regularly check the quality of work to meet standards.
Issue Resolution: Address any issues promptly that arise during the implementation process.

6. Evaluation and Handover:
Objective: Assess the completed work, finalize, and hand over the project to the customer.
Steps:

Final Inspection: Check all aspects of the completed work.
Acceptance: Conduct an acceptance test with the customer.
Handover: Transfer the project and all related documents to the customer.
Warranty: Provide warranty services as outlined in the contract.